The GTV blog shares practical insight from validation programs, tooling development, dimensional control strategy, and controlled production transitions. Content is written for engineering, operations, and program leadership teams responsible for stable manufacturing execution.
The first prototype passes inspection cleanly. Dimensions meet the drawing. The assembly fits. Production is approved. By unit 500, a...
Read post
A working prototype is an important achievement, but it does not prove that a program is ready for production. The...
Read post
A design passed prototype review. Fit and function appeared sound. Yet when the program reached tooling review, manufacturability problems forced...
Read post